Solar Panel Scaffolding
What scaffolding do you need to install solar panels?
A solar PV installation needs a scaffold with a boarded working platform at gutter height running the length of the array, edge protection to every open edge, and a safe route to get panels up to the roof. STR Scaffolding provides solar scaffolding across Surrey and South London for MCS-registered installers and directly for homeowners having panels fitted. We work to installer schedules — up before the install crew arrives, down promptly once the array is commissioned — because solar installs are typically one or two days and a scaffold sitting idle costs everybody money. Our scaffolders are CISRS-trained, we work to NASC standards and we are insured to £10 million.
- Areas covered
- Surrey & South London
- Typical lead time
- Booked around your install date
- Accreditation
- CISRS-trained · NASC standards · £10m insured
- Free quote
- 0203 962 1190
Solar work has a rhythm of its own. The install is fast, the crew is booked weeks ahead, and the panels are awkward, heavy and fragile. The scaffold has to be ready the day before, give the installers a platform they can work along the whole array from, and provide a safe way to lift panels to roof level without walking them up a ladder. Then it needs to come down quickly so the hire is not eating into the customer’s payback.
Working platform at gutter height
Fully boarded lift running the full length of the array with guardrails and toe boards.
Roof edge protection
Protected perimeter so installers can work along and above the array safely.
Panel loading access
Loading points and platform designed for getting panels and rails up to roof level.
Scheduled to your install date
Erected before the crew arrives and struck once the array is commissioned.
Battery and inverter access
Additional access where inverters, optimisers or roof-level plant need reaching.
Handover and inspections
Handover certificate, tagging and statutory inspections while the scaffold stands.
Working with solar installers
Most of our solar work is subcontracted from PV installers who need a scaffolder that understands their programme. We take the booking against your install date, deal with the homeowner directly on access and parking if you want us to, and keep the hire period tight. If an install slips — weather, DNO paperwork, a delayed delivery — we move the dates rather than charging you for a scaffold sitting on a roof doing nothing.
- Domestic solar PV installations on pitched and flat roofs
- Commercial rooftop arrays and warehouse installations
- In-roof and integrated solar systems requiring tile removal
- Battery storage and inverter installations needing roof or loft access
- Solar panel cleaning, repairs, optimiser faults and panel replacement
- Removing and refitting panels for re-roofing work
Booking a solar installation?
Get a free, no-obligation quote. Call us or message us on WhatsApp — we typically reply within the hour.
